ISRO is prepping up for the experimental flight of India’s heaviest and most advanced rocket yet, the Geosynchronous Satellite Launch Vehicle (GSLV)-Mark III, which will take off from Sriharikotta sometime between December 15th-20th. The mission costing Rs 155 crore is to test the atmospheric stability of the rocket. The secondary component of the mission is to test the crew model, stated M Y S Prasad, director, Satish Dhawan Space Centre SHAR – Sriharikota. He further added that the rocket is not equipped with the necessary cryogenic engine needed to put four tonnes satellites into orbit, but that it is currently in development and may take a couple years to get ready.
As the other stages of the other engines are ready, ISRO planned to conduct this mission to analyse the rocket performance and stability while going up. On the crew capsule that’s capable of carrying three crew members, the safety parameters of the capsule as it reenters the atmosphere shall be tested. Even though it’s named crew capsule, it shall carry no human. The rocket shall go up to 120kms reaching a velocity of 5.3 km per second, after which the crew capsule will be detached and it will fall in the Bay of Bengal, 20 minutes following the blast. The capsule shall splash 600kms away from Port Blair and 1600 kms away from the space station, and shall later be recovered by the Indian coast Guard ship.
This mission is aimed and designed to make ISRO entirely self-reliant in launching heavier comm-sats of INSAT-4 class, which weigh nearly 5000 kgs, whereas the existing GSLV-Mark I and II can launch satellites of INSAT-II class weighing 2000 – 2500 kg into Geosynchronous Transfer Orbit (GTO). Once this rocket gets ready, India no longer needs to depend on the European space consortium, Arianespace, to carry its four-tonne INSAT communication satellites. (Image Source : actmaniac.com)
Copyright © 2020 Indian Nerve. All Rights Reserved.
Pingback: ISRO Schedules GSLV-Mk III Advanced Rocket Test-Launch For 18th December | Indian Nerve